North London, Essex & Hertfordshire

info@ktaplumbingdrainage.co.uk

4.9-Star Rated on Google

A finished shower room fitted by our team

Our Job Photos

Recent Work We've Done

  • A finished shower room with a quadrant enclosure, rainfall head and grey panelled walls
  • A broken piece of pipe held up in front of the drain camera screen
  • A pressure gauge reading about 3 bar during a pressure test
  • A finished bath with a front panel and a chrome pillar mixer
  • A combi boiler with its casing off during work
  • The drain camera kit beside an open inspection chamber on a patio
  • A finished quadrant shower with a new tray, neatly sealed
  • A finished small en-suite with a back-to-wall toilet and quadrant shower
  • New blue and red isolation valves on new copper pipe tails
  • A magnetic system filter core coated in sludge from a heating system
  • An inspection chamber after clearing, the channels running clear
  • A finished drencher shower in a white metro-tiled cubicle
  • New pipework joined to the supply under an opened floor
  • A power-flush machine set up beside a wall-hung boiler
  • An outdoor inspection chamber with a newly fitted frame
  • A bath recess clad in marble-effect wall panels
  • A new back-to-wall toilet on new grey floor tiles
  • A finished recessed manhole cover set flush in a floor
  • New large grey floor tiles laid in a shower room
  • A new chrome thermostatic bar mixer fitted on a tiled wall
  • A power-flush machine connected to the heating pipework
  • Digging down to a drain pipe for a repair
  • A shower room floor covered in underlay membrane before tiling
  • New copper elbows behind a tiled wall cut-out
  • Heating pipework with zone valves in an airing cupboard
  • Soil dug out at the foot of a downpipe during a drain repair
  • A finished quadrant shower in an en-suite
  • New valves on new copper tails beside the old corroded ones
  • A new hot water cylinder installed in a loft
  • A patio after a drain repair, the new chamber cover seated in the paving
  • A shower corner with the rotten timber removed and new board laid
  • A new quadrant shower tray fitted in a tiled corner
  • A new recessed manhole cover tray being set into a floor
  • A new copper pipe run with a compression coupler under a floor
  • New treated joists laid after a leak was repaired
  • A blocked inspection chamber before clearing
  • A toilet refitted on a new floor after a leak repair
  • A cold water storage tank after the work, with a new float valve

Free Quotes

Planning a Job Like These?

WhatsApp us a photo of the job or send the form, and we will give you a clear fixed quote for free. For anything urgent, call the team, as we are available 24/7 for emergencies across North London, Essex and Hertfordshire.

Get a Free Quote